78 Merit Crescent
Winnipeg, Manitoba, R2P 2W5
Phone: 204.334.2798
Fax: 204.334.7197
jordan@durwestconstruction.com
Winnipeg, Manitoba, R2P 2W5
Phone: 204.334.2798
Fax: 204.334.7197
jordan@durwestconstruction.com



District Condominiums - 110 James Avenue
General Contractor:
Streetside Developments
Scope of Work:
Streetside Developments
Scope of Work:
- Maxxon Acousti-Mat II Sound Control System
- Maxxon Gyp-Crete 2000 Underlayment
- Approx 20,000 square feet at a thickness ranging from 1" to 3"
- Building served as a warehouse prior to being transformed into condos
- Substrate was old timber construction (2x4’s on edge)
- The Acousti-Mat II sound control system was ideal for this building, as the underside of each floor was to remain original (sound control must be from the top)
- The Acousti-Mat II together with 1" minimum Gyp-Crete 2000 can produce an STC rating of 50 in this assembly.






