Durwest Construction
78 Merit Crescent
Winnipeg, Manitoba, R2P 2W5
Phone: 204.334.2798
Fax: 204.334.7197
jordan@durwestconstruction.com
Who We Are
What We Do
Project
News
Contact
Home
Projects
SWRTC - Rapid Transit Tunnel
General Contractor:
Surespan Construction

Scope of Work:

  • Tunnel Wall Waterproofing & Drainage Composite
  • Tunnel Roof Waterproofing & Protection Board
  • Tunnel Floor Slab Waterprooifng & Protection Board

    • Grace PROCOR 75 Cold Fluid Applied Waterproofing Membrane System
    • Grace Hydroduct Drainage Composite
    • 1/2" Asphalt Impregnated Protection Board

    • Key Benefit: PROCOR 75 membrane can be applied to "green" concrete & damp to touch surfaces. This contributes to an accelerated construction schedule.